Chinese National Stadium
Located in the Olympic Greem, the stadium cost US$423 million. The design, which originated from the study of Chinese ceramics, implemented steel beams in order to hide supports for the retractable roof; giving the stadium the appearance of a "Bird's nest". Leading Chinese artist Ai Weiwei was the artistic consultant on the project.The retractable roof was later removed from the design after inspiring the stadium's most recognizable aspect.Ground was broken in 24 December 2003 and the stadium officially opened in 28 June 2008. A shopping mall and a hotel are planned to be constructed to increase use of the stadium, which has had trouble attracting events, football and otherwise, after the Olympics.
The large steel skeleton of the project weighs 42,000 tons, with the roof and the hanging parts around it accounting for 11,200 tons. To bear such a heavy load, 78 supporting structures were temporarily installed and distributed in different points under stress, i.e. 24 supporting structures along the outer circle, 24 in the middle circle and 30 in the inner circle. The current task is to discharge all these supporting objects from a weight of 11,200 tons.
Beijing National Stadium hosted the Opening and Closing Ceremonies, athletics events, and football final of the 2008 Summer Olympics from 8 August to 24 August 2008. The stadium also hosted the Opening and Closing ceremonies and athletic events of the 2008 Summer Paralympics from 6 September to 17 September 2008. Though designed for track and field events of the Olympics, the stadium will continue to host sporting events, such as football, afterwards. A shopping mall and a hotel, with rooms overlooking the field, are planned to help increase use after the Olympics. Li stated, "This will become the most important public space in Beijing."
Source: www.wikipedia.com
Source: www.wikipedia.com
0 komentar:
Posting Komentar